Dynamic Engineering PMC2PCI Spécifications Page 24

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 128
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 23
HARDWARE INSTALLATION
2-2 PP 41x/03x
2.2 Unpacking and Inspection
Immediately after the board is delivered to the user’s premises the user should carry out a thorough
inspection of the package for any damage caused by negligent handling in transit.
CAUTION: If the packaging is badly damaged or water-stained the user must insist on
the carrier’s agent being present when the board is unpacked.
Once unpacked, the board should be inspected carefully for physical damage, loose components
etc. In the event of the board arriving at the customer’s premises in an obviously damaged
condition Concurrent Technologies or its authorized agent should be notified immediately.
Vue de la page 23
1 2 ... 19 20 21 22 23 24 25 26 27 28 29 ... 127 128

Commentaires sur ces manuels

Pas de commentaire